Management of Fatigue Policy
This statement sets out the policy of the company in respect of managing hours worked to minimise fatigue for ‘Safety Critical Work’ carried out by any employee or subcontractor under our control, in compliance with current version of NR/L2/ERG/003 Management of Fatigue – Control of Changes in Working Hours Safety – Critical Work and the ROGS 2006 (Railway & Other Guided Transport Systems) 2006.
The key compliance requirements and implementation guidance of the above referenced standards are integrated into the following policy and associated documents also referenced within the policy to support effective control.
Responsibility
Hercules Site Services will take all reasonable measures to ensure that those persons referred to above are made aware of the contents of this policy and the effect of their continued employment by the company in the event of any breach of this policy.
Hercules will risk assess the scheduling of work patterns for safety critical workers following the HSE Fatigue Risk Assessment guidelines to ensure minimum risk of fatigue is achieved and will monitor compliance on an ongoing basis, and, if appropriate, this will be done in liaison with the client, particularly for labour supply of SCW (Safety Critical Workers).
Employees of the company will at all times exercise diligence in monitoring their hours worked, including any other/additional employment working, to ensure overall compliance with the limitations detailed below.
Limits on Working Time
It is a condition of employment with the company that all persons referred to above shall comply with the door to door travel guidance note Standard NR/GN/INI/001 (up to 2 additional hours travelling time).
The company will not accept any deviation from the above conditions unless emergency conditions prevail, in which case a risk assessment will be carried out to ensure necessary additional working hours to those rostered are in compliance with current Network Rail Group and Company Standards.
No other employment working times should impact on the above to either exceed the limitations or compromise the flexibility of the workforce of the company.
Compliance
In order to comply with this policy and to maintain the stated and accepted standards of the company, those persons referred to above should, at all times:
The responsibility for the implementation of this policy lies with the CEO.
The CEO shall review this policy annually or following significant changes.
Brusk Korkmaz
CEO
Hercules Site Services